PS 678K Pre-K Center — NYC School Construction Authority

Brooklyn, NY

This gut renovation takes the structure of the former National Biscuit factory warehouse, constructed in 1925 and most recently used as a retail facility, and transforms it into a Pre-K Center which will accommodate 324 children. With 18 classrooms, two exercise rooms, and a 10,000SF adjoining play yard, the facility fulfills the vision of Mayor de Blasio’s program to provide universal pre-kindergarten throughout the City of New York. Given the size of the facility, it is designed to be readily transformed into an Early Childhood Center, and therefore includes a more extensive kitchen facility and other details to allow for this possible future transformation in response to future demographic needs. The project includes a complete modernization of the current stucco-clad building. Located adjacent to the elevated train and a Long Island Railroad cut, the new façade takes acoustical requirements into consideration. Clad in fiber cement panels in varying shades of grey, the façade blends practicality with a playful, inviting mood. The geometric play carries through into the ceramic tile wall treatment of the circulation areas. Wood accents in the corridors provide a welcoming feel for children. The facility is scheduled to open in Fall 2017.

Additional Info

Area: 34,000 SF Construction Cost: $25 Million Construction Date: August 2017